Reporting
What was logged on site during the day is already in the diary by the evening. The site manager adds what only they know, instead of retyping everything.
A site diary is the daily record of a construction site: what was done, who was there, what was found and what was agreed. It is the document everyone goes back to in a dispute about delays, extra work or a defect that only shows up later.
In practice it is written in the evening, from memory and from the photos on a phone. What was already recorded during the day gets typed out a second time. And what is not typed out goes missing.
In PinPoint a finding is logged at the moment it is made: with its place on the plan, the photos, the severity, the answers to the questionnaire and who made it. A diary template puts that together per day, in the layout your site or your client uses.
What it does not do
PinPoint only knows what is logged in PinPoint. Weather, crew numbers and deliveries are added by the site manager. What becomes automatic is the part that would otherwise be retyped.
Everything comes from that day's records. Nothing is copied in afterwards from an email or a photo folder.
The day's findings
Every new finding with its description, category, severity and its place on the floor plan or view.
Photos
The photos taken with the finding, attached to the point they are about rather than loose in an appendix.
Follow-up of older items
What was fixed, verified or closed that day, and by whom. So the handling of last week's items is in today's diary too.
Completed checks
The answers to questionnaires filled in on site, such as a safety walk or a checklist at a project stage.
Who logged what
The names of the people who logged or handled findings in PinPoint that day, with the time.
In a dispute
A site diary is only worth something if nobody doubts it. A report written from memory in the evening raises questions. A record with a photo, a location and a time, made on the spot, far fewer.
A later change overwrites nothing: it is added as a new step, with who, when and why. More on the page about the audit trail and sign-off workflows.
Recorded on the spot
Time and author come from the record itself, not from a report written afterwards.
On the plan
Not only what was found, but where. The contractor walks straight to the right spot.
Nothing disappears
A closed item stays in the history, with the before and after photos.
Every client has their own expectations of a diary, and many contractors have used the same template for years. That is why the site diary in PinPoint is a report template set up to match yours: your sections, your order, your house style. How such a template comes about is explained under custom reports.
The same goes for the safety coordinator's coordination log: the findings with date, location and follow-up that belong in it are already in PinPoint. More on inspections on site under site inspections.
A sample report of a construction site, made with demo data: three buildings on plan, ten findings with photos, four of them already closed. The same data fills the diary. The document is in Dutch.
Download the sample (PDF)A site diary is the daily record of a construction site. For each day it records the work carried out, who was present, the conditions, what was found and which instructions were given. On public works in Belgium it is the official works diary (dagboek der werken, journal des travaux). In a dispute about deadlines or defects it is usually the first piece of evidence.
No, only what is logged in PinPoint: the findings with photos, the status changes, the completed questionnaires and who logged them. Sections such as weather, crew numbers and deliveries are added by the site manager. The part PinPoint fills in is exactly the part that would otherwise be retyped.
Yes. The diary is a report template in HTML and CSS, so the layout, the sections and the order are set up to match what your client or your own quality system asks for. Such a custom template is set up per project.
Yes. The app works offline and syncs as soon as there is a connection. A basement or a remote site is no reason to fall back on paper.
Send us a filled-in page from your diary, and we will show you which part PinPoint fills in for you. No obligations.